Lead Acid Battery 12V 2.3Ah 178x35x60mm LONG
Specification:
- Battery Type: WPS2.3-12
- Nominal Voltage (V): 12V
- Nominal Capacity (Ah):
- 5HR: 1.95
- 20HR: 2.3
- Lenght: 178 mm
- Width: 34.5 mm
- Height: 60 mm
- Weight: 0.87 Kg
Contact Us
Specification:
The product is currently Out-of-Stock. Enter your email address below and we will notify you as soon as the product is available.